Send your enquiry
Choose a package. Tell us your plans.
PLAN IT. PRICE IT. SEE IT.
Bathroom design, tiling cost checks and 3D visualisation. From a working tiler, across Australia.

01 / HOW IT WORKS
Choose a package. Tell us your plans.
Plans, measurements, photos and tile choices.
Review your options with your local trades.
02 / FIND YOUR FIT
01
Know your tiling budget.
Delivered within 2 business days
02
Plan before renovation work begins.
Delivered within 2 business days
2D bathroom layout example03
See your bathroom before you build.
Delivered within 2 business days
3D conceptYour $59 Cost Check fee is credited in full when you upgrade within 30 days for the same bathroom.
View our sample cost report template. Fixtures & fittings estimates are included with Pre-renovation planning and the Complete Bathroom Plan.
Delivery starts once payment and all required project information are received. Business days exclude weekends and public holidays. For the Complete Bathroom Plan, this covers your initial plan; revision timing is confirmed separately.
Package fees are in AUD. Detailed tile set-out and on-site inspections are excluded.
Estimated project costs: Prices provided in your cost check are estimates only, not fixed quotes or guaranteed final costs. Pricing can vary depending on the trades engaged, location, project complexity, tile size and type, materials and finishes, site access, preparation and substrate condition, demolition, waterproofing, plumbing or structural work, concealed issues, trade availability, changes to scope and when the work is carried out. Estimates rely on the accuracy of your supplied measurements, photos and project details. Confirm the final scope, inclusions and price with your chosen trades through written, site-specific quotes before committing to work.
03 / FROM BEFORE TO FINISHED
We used the same planning process on our own bathroom renovation — taking it from the existing space through planning and visualisation to the renovation now underway.

The original bathroom.

Our 2D layout showing the proposed bathroom.

The intended finishes and layout.

The plan taking shape. Finished photos coming soon.
ABOUT US / THE PEOPLE BEHIND PLAN IT
Plan it is brought to you by an experienced NSW-based tiling business.
Hands-on industry experience. Practical bathroom planning online across Australia. Designed to help you plan with confidence before engaging your own local trades.
CJ Tiling on Facebook (opens in a new tab)04 / BEFORE YOU BEGIN
Yes. This is a remote bathroom planning and tiling cost review service for homeowners across Australia. Your location and the information you provide help inform the review. You can take the findings to your own local trades.
No. These are standalone planning services. You can use your own tiler and other trades, wherever you are in Australia.
A floor plan or sketch with dimensions, clear photos of the room, your proposed fixtures and tile choices, and any questions you want reviewed. If you are still at the ideas stage, tell us what you have so we can confirm whether there is enough information to begin.
No. The cost check provides an estimated tiling cost based on the information you supply, with assumptions and major cost drivers identified. Prices are estimates only, not fixed quotes or guaranteed final costs. Pricing can vary depending on the trades engaged, location, project complexity, tile size and type, materials and finishes, site access, preparation and substrate condition, demolition, waterproofing, plumbing or structural work, concealed issues, trade availability, changes to scope and when the work is carried out. It is not a whole-bathroom renovation quote. Obtain written, site-specific quotes from your chosen trades before committing to work.
Pre-renovation planning and the Complete Bathroom Plan include a fixtures and fittings checklist with a supply-only cost estimate. Installation costs are excluded from this estimate.
No. Detailed tile set-out is excluded because it depends on actual site measurements, tile dimensions, falls and installation conditions. Your installer will need to confirm the final arrangement on site.
The Complete Bathroom Plan includes a concept view of your bathroom with your tile and colour selections represented, plus one revision. It helps you compare the look before you commit. Colours, textures and proportions are illustrative; it is not a construction drawing.
No. The review highlights planning considerations and potential issues from the information supplied. Your on-site trades must verify dimensions, falls, waterproofing, plumbing and installation requirements. Concealed conditions cannot be assessed remotely.
Yes. Upgrade within 30 days for the same bathroom and your $59 Cost Check fee is credited in full. At introductory pricing, pay an additional $110 for Pre-renovation planning or $190 for the Complete Bathroom Plan. Send an upgrade enquiry and we’ll confirm your previous purchase and eligibility before payment.
Delivered within 2 business days once payment and all required project information are received. Business days exclude weekends and public holidays. For the Complete Bathroom Plan, this timeframe covers your initial plan; we confirm timing for your included revision separately.
Start by sending your project enquiry below. Scope, required information, availability and payment arrangements are confirmed before work begins. The enquiry form does not take a payment or confirm a booking.
05 / LET’S TALK ABOUT YOUR PLAN
Choose a package. Tell us your plans.
$169 AUD · per bathroom
No booking commitment. We confirm scope, timing and payment before starting.